headerL
headerR
Left effects
Right effects
Important Site Information:
Notice, if you are using Internet explorer to view this site, it is strongly recommended that you run it in compatibility mode or use firefox or google chrome
TopL TopM TopR
MiddleL


You are not logged in currently. If you are not already a member, please take a moment a complete our free registration (a valid email is required to verify your registration). Once you complete 2 minute registration process, you will be able to create new threads, reply to threads, rate and subscribe to threads, and much more.
If this page has helped you, be sure to give it a google "+1", by clicking the icon to the right or anywhere you see it on this page.
3/29/2010 10:31:29 PM
 
superJMuser
422 Posts
Joined 08/19/2009
www.revitinfo.com
Entry Type:
General Information
Category:
Building Information Modeling (BIM)
Subcategory:
Integrated Project Delivery (IPD)

Has this Forum Helped You??

If you have been helped by the Revit forum on our site, help keep us up and running by making a quick donation! Your donation of any amount (even as little as $1) is greatly appreciated!

Repost: Time Cost Quality Triangle - The BIMuda Triangle (Source Link)  

 

Another nice BIM post by Gregory at Revit3d.com.  Use the Trackback Link above to go to the original post.
 
I'm sure you're all familiar with this
  • Design – Completing the build to plans and specification.
  • Cost - Completing within budget.
  • Time - Completing within the designated time frame.
  • Quality - Ensuring a satisfactory quality of workmanship.
  • Legal - Complying with legal requirements.
 
How much time you spend on the project increases the quality and the cost. I think this is the inherent problem with CAD. I'm finding that it's not AutoCAD versus Revit, but more about the workflow and process of the software and how that directly impacts the triangle.

 The triangle works on the principle that as more emphasis is placed on one element, less is placed on the others.
Example - If you want a very low cost design, then you will have to sacrifice quality and the length of time to get it done.
It is generally accepted that it's only possible to achieve two of the elements at the same time, so you can have a high quality design and you can get it done quickly……. but it’ll cost you somewhere.

 We know that clients want to pay less money. That means you have to lower the cost of the project. That affects the quality of the construction documents. During construction, that leads to more time spent on the project. That costs you more money. We won't even discuss the legal aspects of all of this.

 So, what if the secret of Revit is that it's about how it makes a better workflow and improves the process. So many people are fighting that specific change. The don't want to change. But why not? What if there is a better way? Wouldn't you want to embrace a change of workflow that could lower your cost and time, but increase quality?

 Thus, we wind up in the BIMuda Triangle. Of course, I've just registered www.BIMudaTriangle.com. It seems that many are caught in the CAD triangle. What is the phenomena of Revit and BIM? Why do you think so many people are moving to it on a daily basis? Think about that linear workflow of how you interact with your engineers. When do you give them your backgrounds? How much time do they have to react to changes you make downstream? What if the owner hires outside consultants? Who's responsible for the time to coordinate their work?

 In the BIMuda Triangle, it is the opposite of what you go through today. When the time goes down, and the cost (less salary needed) go down, quality actually goes up. How is that possible? We, who use Revit daily, already know the answer. You would think that after so many years of errors, omissions, RFIs, Change Orders, delays and every other problem that you've had, you would want to try something different, even if it had the remotest possibility of making a positive difference.

 On the bright side, the GSA, Contractors and some states, Wisconsin and Texas (hi Chris, hope you're doing well), get it and see Revit/BIM as a business decision, and not just another piece of software. These are executive level conversations. It's not about the software. It's about the process. Did AutoCAD really change anything from hand drafting? Isn't it pretty much the same process, only on a computer screen instead of a piece of paper? Did you really change that much by switching to AutoCAD over the past 28 years. I just love having these conversations with myself on the blog. I do use them in every conversation I have, so hopefully one more person reading this will finally switch to Revit.

Should we discuss Integrated Project Delivery and LEED in regards to the current CAD process?  Is CAD a process?  Computer Aided Drafting.  That just sounds like a tool, not a process.  With all of these complexities, how do you plan to survive once the recession ends.  Can you keep doing it the same way?  Does Computer Aided Drafting equal Project Delivery?  What does it take to deliver a project?  Do you consider the project the set of blueprints or is the project the actual completion of the building?  Where do you draw the line?  

 Your thoughts?
____________________
Last Edit on:3/29/2010 10:36:08 PM
No records found


You must be a registered user to Rate entries.  Please take a moment a complete our free registration (a valid email is required to verify your registration).


You must be a registered user to Subscribe to individual entries.  If you would like, you can subscribe to all future new posts and/or replies by filling out this form.  Otherwise, take a moment a complete our free registration (a valid email is required to verify your registration).

Below is a list of things to be aware of when browsing through the Revitinfo.com Forum:

 1)  As a registered user at Revitinfo, you automatically are signed up to recieve emails any time a new post or reply to existing post is made. You can change this setting while logged in under your User Profile by clicking on your user name at the top right of any page, next to the Date (or by clicking on the My Profile Button on any Forum Page). Once you get here, click on the "Edit Profile" link below your Quick Profile Information. Finally, select "Manage Profile" and scroll down the the very bottom to change your forum email subscription Settings. 

 2)  Each Entry must have an assigned Category and EntryType.  Not all categories have subcategories, but if the category you pick has subcategories, please pick the most appropriate for your entry.

 3)  Only registered, logged-in users have the privledges to create posts, reply to posts, and view attachments of posts.  Registration is free, and like any other forum, is our way of increasing forum functionality and security.

 4)  As a registered user, you will also have the ability to subscribe to threads individually, rate them, and view a list of your posts.  You can also edit posts that you have made.  Also, as a registered user at Revitinfo, you automatically are signed up to recieve emails any time a new post or reply to existing post is made. You can change this setting while logged in uder your User Profile by clicking on your user name at the top right of any page, next to the Date. Once you get here, click on the "Edit Profile" button below your Quick Profile Information. Finally, select "Manage Profile to change your profile Settings.

 5)  Soon, there will be a way for users to request other categories/SubCategories via a request form.  Currently, for our system to work the way it has been designed, the category and subcategories as well as EntryTypes must remain a standard for all users of the site, in order to make searching/browsing information faster and easier.

 

Copyright Notice:  Autodesk: Revit is a product that is wholly owned by Autodesk. Any reference to Revit, Revit Architecture, Revit MEP or Revit Structure on this site is made acknowledging this ownership. Refer to Autodesk's own web site and product pages for specific trademark and copyright information. Autodesk represents a great many products and every attempt will be made to respect their ownership whenever one of these other products is mentioned on this site.


MiddleR
BottomL BottomM BottomR